
Schedule View
3-30 ArrangeLink User Guide
Selected Schedule Details
The third Schedule View sub-screen, Details, works in conjuction with both the
Schedule Instances screen and the Schedules screen. Selecting a scheduled
event from one of these two screens and then opening the Details tab will
provide additional information pertaining to that specific event.
Figure 3-29
Schedule View, Details for Schedule Instance
Schedule Instances Details
The details for the Onetime Upstream Switch event that is selected in the Sched-
ule Instances screen example (figure 3-26) is shown in figure 3-29, above.
This screen has an upper panel that presents the following details:
• Schedule Name – the name assigned to this schedule.
• Circuit Type – the type of circuit for this schedule.
• Data Rate/Priority – the specified data rate (kbps) and priority level.
• Start Date/Time – the date and time for this event to start.
• End Date/Time – the date and time for this event to end.
• Status – pending, starting, running, completed, failed, or expired.
Comentarios a estos manuales