
Introduction
3-6 ArrangeLink User Guide
This will prevent creating a new schedule that is in conflict with an existing
schedule.
Note: If there is a VMS managed event that is ongoing at the time of a sched-
uled event, assigned priorities will determine whether or not the sched-
uled event will supersede the ongoing event and take over the SCPC
circuit.
See the section “Advanced Switching” on page 3-22 regarding the
setting of the Priority level for a scheduled event.
NOTE
Comentarios a estos manuales